Transit & Capacity Details:
FCL (20GP, 40GP, 40HQ, 40NOR, 45HQ): 26–33 day transit from Nansha Port to Derince (via Suez Canal + Mediterranean Sea + Dardanelles Strait, direct or via Port Istanbul transshipment). Ideal for shipments over 15 CBM, such as automotive bulk components (engine blocks, transmission parts for Tofaş’ Bursa factory), petrochemical equipment (refinery pipes, reactors for Derince’s industrial zone), or heavy machinery (construction cranes, agricultural harvesters for Central European distributors). This solution leverages Derince’s deep-water terminals and rail links to Ankara/Budapest to cut post-port delivery time by 28% vs. smaller Turkish ports.
LCL: 28–35 day transit (via transshipment), perfect for shipments under 15 CBM. Ideal for combining precision auto parts (sensors, wiring harnesses), small-batch 化工 supplies (catalyst components, lab equipment), or Central Europe-bound goods (textile machinery parts, retail electronics for Romanian stores) from multiple PRD suppliers. This option caters to Turkish auto SMEs, petrochemical firms, and Eurasian trading companies.
Industry Alignment: Derince (Safi Derince Uluslararasi Liman) handles 30% of Turkey’s Black Sea cargo and 25% of Eurasian transit trade, serving sectors like automotive (Turkey’s (28B auto industry, Tofaş’ annual 400k+ vehicle production), petrochemicals (Derince’s )5B refinery complex), and heavy machinery (Turkey’s construction equipment exports). Our solutions support these sectors—whether you’re an auto parts maker sourcing from PRD hubs, a 化工 equipment supplier importing from Shenzhen, or a trader bringing goods from Dongguan. Our consolidation, paired with PRD Suppliers Manufactory Trailer service, streamlines supply chains for time-sensitive operations, such as Tofaş’ production cycles (monthly assembly targets) and refinery maintenance windows (Q1/Q3).
Trailer Scheduling: Our 50+ dedicated trailers (servicing all PRD cities since 2010) pick up cargo from multiple suppliers on a fixed schedule—e.g., Guangzhou auto parts on Monday, Shenzhen 化工 equipment on Tuesday, Foshan crane parts on Wednesday—ensuring all goods arrive at our Guangzhou warehouse within a 4-day window (avoids fragmented pickup delays that could miss Tofaş’ production deadlines).
Timeline Optimization: If Supplier A (auto sensor maker) needs 8 days to produce, Supplier B (化工 reactor firm) needs 12 days, we adjust trailer pickup times to sync with production—no cargo waits in storage, saving clients (300–)600 in weekly storage fees.
Gap Resolution: In 2023, a client’s Foshan crane component supplier faced delays; we rerouted a trailer to pick up backup parts from our verified PRD network (built since 2007), ensuring the shipment met Derince’s transit deadline for a Hungarian construction firm.
Spec Verification: We confirm auto parts meet Tofaş’ ISO/TS 16949 standards and 化工 equipment complies with Turkey’s TSE certification (critical for Derince port clearance).
Auto Parts: Plastic crates (reusable for Tofaş’ assembly line) + anti-rust liners (for metal components) + barcoded labels (aligned with Tofaş’ inventory management system). Trailers are equipped with shock-absorbent mats to protect precision sensors during 200–500km PRD road transport.
化工 Equipment: Chemical-resistant steel crates (lined with PTFE foam) + pressure-testing tags (required by Derince refineries) + TSE/CE dual certification labels. Trailers have vented compartments to prevent chemical vapor buildup during transit.
Heavy Machinery Parts: ISPM 15-certified wooden crates (for EU/Turkish import) + steel brackets (to secure bulky components) + bilingual (English-Turkish) handling instructions. Trailers use liftgates for easy loading of 500kg+ parts.
Industry Compliance: Auto parts are tested against Tofaş’ quality control standards; 化工 equipment is checked for TSE and EU REACH certification (mandatory for Turkish import).
Packaging Validation: We ensure wooden crates meet ISPM 15 standards and labels include HS codes (e.g., 8708 for auto parts, 8419 for 化工 reactors, 8426 for cranes).
Document Cross-Check: We verify certificates of origin (to claim Turkey-EU Customs Union duty benefits) and PRD supplier invoices (for Derince customs transparency).
Client Benefit: In 2024, our pre-inspection caught a batch of non-TSE-certified 化工 valves—avoiding a 12-day Derince customs hold and a $5,200 penalty for the client.
Auto Parts Zone: FIFO storage racks (aligned with Tofaş’ just-in-time production schedule) + barcode-scanning stations (to track each PRD supplier’s cargo).
化工 Equipment Area: Climate-controlled bays (20–22°C, 40–50% humidity) + leak-detection stations (to prevent chemical spills during storage).
Machinery Parts Zone: Reinforced floors (up to 80 tons) + pre-assembly stations (to simplify Derince unloading, e.g., pre-attaching crane hydraulic lines).
Flexible Terms: We offer 5–21 days of free storage for PRD-sourced cargo—critical for clients with 6+ suppliers (e.g., a 2023 client consolidated 5 PRD suppliers’ goods over 14 days, saving $750 in storage fees).
FCL Loading: Heavy 化工 reactors (base) → auto parts (middle) → machinery components (top). We use 40HQ containers for Tofaş’ chassis parts—reducing Derince-port trucking trips by 2 (saves $800 per shipment, plus tolls on the Istanbul-Ankara highway).
LCL Consolidation: Cargo is grouped by priority (e.g., "Tofaş Bursa Urgent" vs. "Budapest Machinery Routine") with color-coded labels. In 2023, this prioritization got a client’s auto parts unloaded in 7 hours (vs. the industry average of 32 hours).
PRD Cargo Sync: We load cargo from the same PRD supplier in adjacent positions—making it easier for Derince clients to sort and distribute to Central European destinations.
Export Docs: Itemized invoices (linking each item to its PRD supplier), packing lists (with ISPM 15/TSE references), and certificates of origin (for duty-free entry into EU via Turkey’s Customs Union).
Import Prep: Turkish customs declarations (Turkish Commercial Invoice + Declaration of Conformity), Safi Derince Liman unloading permits, and Eurasian transit documents (for Hungary/Romania-bound goods).
Client Result: Our documentation cuts Derince clearance time by 3–5 days vs. generic forwarders—e.g., a 2024 shipment of PRD-sourced Tofaş parts cleared in 48 hours (vs. 7 days for a competitor’s shipment).
Benefit | Details for Derince Clients | Real-World Example |
PRD Supplier Efficiency | Dedicated trailer service unifies pickup from Guangzhou/Shenzhen/Foshan; saves 3–6 days vs. fragmented supplier delivery. | A 2023 client with 4 PRD suppliers cut pickup time by 5 days and reduced transport costs by $1,100. |
Cost Savings | FCL consolidation cuts sea freight by 18–28%; LCL shared space saves 18–28% vs. full containers. | A Tofaş supplier saved $6,300 by consolidating 5 PRD suppliers into one 40HQ container. |
Time Efficiency | Direct Nansha-Derince route reduces transit by 7–9 days; pre-booked port slots cut unloading time by 24+ hours. | A 化工 client’s reactor parts arrived 6 days early—enabling Derince refinery maintenance to finish ahead of schedule. |
Risk Mitigation | Comprehensive insurance covers PRD road transport, sea risks (Suez Canal delays, Dardanelles storms), and Derince transit; 24/7 tracking. | A 2022 shipment of heavy machinery parts was damaged in transit—our insurance covered $15,000 in repairs. |
EXW (PRD Full Service): We pick up from your PRD suppliers (via dedicated trailer), handle consolidation, sea freight, Derince customs, and deliver to Tofaş’ factory/Derince refineries—ideal for clients new to PRD-Turkey logistics.
FOB (Warehouse Control): Your PRD suppliers deliver to our Guangzhou warehouse (we arrange trailer pickup if needed); we manage shipping, pre-clearance, and Derince unloading—keeping you in control of production timelines.
CIF (All-Inclusive): End-to-end management (PRD pickup + consolidation + shipping + insurance + Derince delivery) with no hidden fees. Auto clients get free coordination with Tofaş’ procurement team; 化工 clients get free TSE certification consulting.
PRD-Eurasian Expertise: We’ve served 120+ PRD-Turkish clients since 2007—understanding Tofaş’ production needs, Derince port rules, and Eurasian transit shortcuts (e.g., Balkan rail corridors). Our PRD Suppliers Manufactory Trailer service covers 98% of PRD industrial zones.
Trusted Network: Our 500+ verified PRD suppliers and 30+ Turkish/European logistics partners (e.g., MSC, KLine) ensure reliable service—e.g., we avoided 2023 Dardanelles closure delays by switching to Port Izmir transshipment.
24/7 Multilingual Support: Our team (fluent in English, Turkish, Mandarin, and Hungarian) resolves 98% of issues within 4 hours—e.g., a 2024 client’s PRD trailer breakdown was fixed in 3 hours via our backup driver network.
Q1: How do you handle multi-supplier consolidation from PRD to Derince?
Q2: What’s the transit time for LCL shipments from Nansha to Derince?
Q3: Do you verify PRD suppliers for Derince shipments?
Q4: Can you handle Eurasian transit from Derince?
Contact Us
Email: CargoShipping@qq.com
sales8@BLShipping.com
WeChat / WhatsApp / Tel: 008618898403007
office: Room 607-608, 6/Floor Talent Building,
No. 1 Yichuang Street, Huangpu District,
Guangzhou City, Guangdong 510555 China
WeChat QR
WhatsApp QR
BETTERluck Shipping (Guangzhou) Limited
Tax Registration No.: 9144010105658851XX
NVOCC No.: GD202011063586 member of
Made-in-China Alibaba 1688 CIFA WCA IATA
China Import and Export Fair (Canton Fair)
Website: https://www.BLShipping.com/
Copyright 2007-2025 all rights reserved
About Us